So Rob popped round again yesterday and helped me get the car back on the trolley. I then went to see Orchard Restorations' open day with my wife. It is always interesting and I enjoyed talking to the paint professionals at the workshop. It was nice not to be worried about door gaps and metalwork, felt like a real change. I got a little more information on the blue colour code which was good.
Today I got back to the rubbing down.
I also did a little filler work on the sills. I haven't rubbed down filler in 28+ years but the joy came flooding back.
Then it was time for paint once I had flatted the whole car.
I had more of a challenge painting the top of the car than the bottom. Having used 1.25l of primer for the base I ordered another 2l of paint and thought that it would easily be enough for two coats. It wasn't so I found myself adding more thinners to the mix as I went along to stretch out the paint. I did two coats but really, the second was a little rushed (this is a polite way of telling you that I got a few runs). Had I bought 3l of paint it would have been enough. So I am thinking that really I should give it another coat but I don't want to do that because I'll need to rub the damn thing down again. I will take it out of the garage on Tuesday after work if it is not raining and have a look and make my mind up.
It does feel good to have it in primer.
Happy days
No comments:
Post a Comment